Ticket #171 (new Bugs)

Opened 23 months ago

Last modified 42 hours ago

Overflow when computing duration

Reported by: mrpingouin Owned by: admin
Priority: 1 Milestone: NEAR FUTURE
Component: Liquidsoap Version:
Keywords: Cc:
Mac OSX: yes Linux: yes
NetBSD: yes Other Operating System: yes
FreeBSD: yes

Description

$ liquidsoap -r longlongfile.mp3
Computing duration: -408.64 sec.

I'm wondering if it has bad effects besides this..

Change History

Changed 23 months ago by toots

As far as I know, duration is only used for lastfm submissions, which has just been changed by default to Broadcast submissions now that they support it. This type of submission doesn't need duration, so it is not used.

Changed 23 months ago by toots

  • milestone set to NEXT RELEASE

Changed 23 months ago by toots

  • milestone NEXT RELEASE deleted

Changed 22 months ago by toots

  • milestone set to NEAR FUTURE

Changed 42 hours ago by 太阳能

China is the world's commitment to implement energy-saving emission reduction targets, to enhance policy support the new energy economy strategy, accelerating the construction of solar photovoltaic technology in rural and urban areas of the application, the relevant state ministries launch solar roofs program. Solar roof planned efforts to break through the integration and solution architecture design of a lack of optical, optoelectronic products combined with low level of construction, optical and network problems, low market awareness of the problem. Solar Roofs Plan into consideration economic and social benefits and other factors, at this stage of economic development, industrial base cities to actively promote a better solar roofs, building integrated photovoltaic curtain wall and other optical model; actively support development in rural and remote areas from the net-generation, implementation of transmission to rural areas, the implementation of the national farmer-friendly policy. Solar roof planned to mobilize all sectors of society through the development of demonstration projects and promote the implementation of relevant national policies. Demonstration projects to strengthen advocacy, to expand its influence, increase market awareness, formation and development of solar photovoltaic products, a good social atmosphere; to promote the implementation of tariff and other Internet-sharing policy, the formation of policy together, amplifying the effect of policies; the optical construction applications as an important building energy efficiency content, in new construction, existing building energy-saving, actively promote the use of urban lighting. Policy limit sun roof demonstration project must be greater than 50kW, which requires at least 400 square meters of total floor area, construction is difficult to participate in the general population, eligible owners will focus on schools, hospitals and government and other public and commercial buildings. Ministry of Finance to consider subsidies, the cost of electricity can be reduced to 0.58 yuan / kWh. Whether PV electricity price electricity price in the thermal power given premium is not clear, but even without the premium, due to lower power generation cost sales price, the owners are still building solar power projects to generate electricity for personal use, replacement power purchased from power. Moreover, local governments can be expected to give additional subsidies, electricity costs will decline further  http://solar-poweronline.info/

Note: See TracTickets for help on using tickets.